F-35 Lightning II JPO Teases F-55 on Veterans’ Day Poster
F-35 Lightning II Joint Program Office teased the F-55, the twin-engine variant of F-35 announced by President Donald Trump, on its Veterans’ Day poster.
F-35 Lightning II Joint Program Office teased the F-55, the twin-engine variant of F-35 announced by President Donald Trump, on its Veterans’ Day poster.
Department of Defence has awarded Lockheed Martin a contract worth $11.76 billion to manufacture 145 F-35 fighter jets in various configurations.
Deploying S-400 at IAB won’t solve the problem. The threshold is not about easing U.S. concerns. It is about meeting the NDAA and CAATSA demands.”
A Memorandum of Agreement that covers the contractual framework for F135 engine production and sustainment projects in Finland by Patria was signed today.
The US's House Armed Services Committee wants to restore funding for the next-gen fighter’s F135 engine with a $588.4 million price tag rather than the AETP.
While Turkiye negotiates the F-16 acquisition, U.S. Aircraft Manufacturer Lockheed Martin plans to take place at IDEF next month.
U.S. Air Force JSF Programme Director revealed that only about half of the F-35 fighters in the U.S. fleet are ready to perform war missions.
US identifies the problems it faces in F-35 production and takes precautions for the NGAD program.
President Erdoğan visited Baykar to observe the company’s ongoing work. He stood in front of the KIZILELMA UAV, where the photo included a clue about TB3.
The first squadron of the S-400 Triumf sam system is nearly operational in northwest India, but the delivery of the second squadron from Russia.
According to Danish Radio, Danish Defence intends to sell 16 to 24 of its 43 F-16 fighter jets before the arrival of its complete force of F-35s in 2025.
Spokesperson to the President of Turkey, İbrahim Kalın, made exclusive statements to Milliyet regarding Turkey’s request to acquire F-16s from the U.S.
The JPO and Lockheed Martin have agreed on an F-35 production rebaseline that ensures predictability and stability in the production process.
Forsvaretdk receives its first F-35A fighter. The aircraft will remain in the US for two more years and will be delivered at Skrydstrup.
The U.S. GAO examined the cost of the JSF program. The office claims that removing Turkey and establishing alternative suppliers will cost $108 million.
USAF officially accepted the first F-15EX fighter on 10 March at Boeing’s St Louis production facility in Missouri.